Instruction manual

NGA 2000 MLT Hardware
CHECK AND REPLACEMENT OF ELECTROCHEMICAL OXYGEN SENSOR
18 - 5
Emerson Process Management GmbH & Co. OHG
Instruction Manual
90002929
07/2006
EXCHANJGE / REINSTALLING OF EO
2
-SENSOR
18.3.2 Replacing the EO
2
-Sensor
Disconnect the connector for the sensor from “P2” of circuit board “OXS” (see Fig. 18-3).
Take the consumed sensor out of the fitting.
Take off the stopper from new sensor and fit in the new sensor into the fitting, so
that the name plate is at the top of the sensor.
Connect the connector for the sensor to “P2” of circuit board “OXS” (see Fig. 18-3).
Close the spent sensor with the stopper and dispose in accordance with respective
legislation or send it to our factory alternatively.
18.3.3 Reinstalling of the EO
2
-Sensor
MLT 1 only:
Put connection block with the (new) sensor onto the front panel and srew the fastening
hexagon nuts of the connection block (Fig. 18-2) with hexagon spanner (SW 5.5).
Perform a leakage test (see Section 14.) and set the sensor (see Section 18.2.4).