Instruction manual
NGA 2000 MLT Hardware
OPENING OF HOUSING
15 - 9
Emerson Process Management GmbH & Co. OHG
Instruction Manual
90002929
07/2006
MLT 3 FOR GAS PURITY MEASUREMENT
15.3.3 Front Panel (MLT 3 gas purity measurement)
15.3.3.1 Operation Front Panel
❍ Unscrew the 6 fastening screws (Fig. 15-8)
Remove operation front panel to the front carefully.
15.3.3.2 Left Front Panel
❍ Unscrew the 4 fastening screws (Fig. 15-8).
Remove left front panel to the front carefully.
Gas lines and optionally internal components may be fixed to the front
panel (see fig. 1-24)!
Repeat above steps in reverse order to assemble the housing
Take care not to squeeze internal electrical connections and gas lines when
assembling the housing!
Fig. 15-8: MLT3 (gas purity measurement) (1/1 19" housing)
(Fastening screws front panel)
Fastening screws, operation front panel
Fastening screws, operation front panel
Rosemount Analytical
NGA 2000
F3 F4 F5F2
F1
Fastening screws, left front panel
Fastening screws, left front panel