Instruction manual
NGA 2000 MLT Hardware
OPENING OF HOUSING
15 - 5
Emerson Process Management GmbH & Co. OHG
Instruction Manual
90002929
07/2006
15.1.2.2 Front Panel
❍ Opening housing cover (Item 15.2.1).
❍ Unscrew the 6 fastening screws at both housing sides (Fig. 15-4)
❍ Remove front panel to the front carefully.
Optionally internal components may be fixed to the front panel, e.g. inter-
nal fan, UVS, oxygen sensor, pressure sensor (see fig. 1-7)!
Repeat above steps in reverse order to assemble the housing
Take care not to squeeze internal electrical connections and gas lines when
assembling the housing!
MLT 1 (1/2 19" HOUSING)
Fig. 15-4: MLT 1 (1/2 19" housing)
(Fastening screws front panel)
Fastening screws,
front panel