Instruction manual

NGA 2000 MLT Hardware
INSTALLATION
5 - 23
Emerson Process Management GmbH & Co. OHG
Instruction Manual
90002929
07/2006
b) Instrument with solenoid valve block
The connection of sample gas, zero gas and span gas will be done to the solenoid valve block at
the rear side of the instrument (Fig. 5-14 and 5-15). The common exhaust of solenoid valve block
is be lead to the real sample gas inlet of the instrument via stainless steel tube (see Fig. 1-30a).
Fig. 5-15: Solenoid valve block MLT 3 (gas purity measurement) (side view)
c) Instrument with quick shutoff connector
The connection of sample gas will be done to the quick shutoff connector at the front side of the
instrument (Fig. 5-16). The sample gas will be lead internally via stainless steel tube either to the
4/2-way-valve or to a gas outlet at the rear side of instrument and then to the sample gas inlet of
the solenoid valve block (see Fig. 1-30b, too).
All other gas connections will be done as described in section 5.3 and 1.8.
Fig. 5-16: MLT 3 (gas purity measurement), front view
Flow meter Operation front panelQuick shutoff connector
(sample ges input, option)
Manual 4/2-way-valve
(option)
Rosemount Analytical
NGA 2000
F3 F4 F5F2
F1
ANALYZER SPECIFIC INSTRUCTIONS: MLT 3
span gas
exhaust
(common)
sample gas
zero gas