Instruction manual
NGA 2000 MLT Hardware
INSTALLATION
5 - 19
Emerson Process Management GmbH & Co. OHG
Instruction Manual
90002929
07/2006
c) Cable Gland Assembly Instruction for Shielded Cables
1. Strip the cable insulation.
2. Uncover the shielding
3. Feed cable through gland nut and into fixing element.
4. Put the shielding net over the element the way that it covers the o-ring 2 mm.
5. Stick the fixing element into the neck and fix the gland.
ETC00791
Cable gland sealing plug
ETC00790
Cable gland allen screw sealing plug
Fig. 5-10: Cable Gland Assembly Instruction for Shielded Cables
Fig. 5-11: Cable gland sealing plug / Cable gland allen screw sealing plug
ANALYZER SPECIFIC INSTRUCTIONS: MLT 2