Instruction manual

NGA 2000 MLT Hardware
INSTALLATION
5 - 11
Emerson Process Management GmbH & Co. OHG
Instruction Manual
90002929
07/2006
Fig. 5-4: MLT 1, standard gas connections
Depending on analyzer version the following gas connections are installed:
in = Gas inlet out = Gas outlet
Channel 1 = measuring channel 1 Channel 2 = measuring channel 2
Channel 3 = measuring channel 3 reference = Reference gas (Differential measurement)
purge = purge gas (housing)
Note!
Purge and reference option combination is only available with two channel
analyzer.
ANALYZER SPECIFIC INSTRUCTIONS: MLT 1
Network connection (RJ 45 socket)
[not for platform mounting module] Gas connections
Input 24 V dc [not for platform mounting module]optional PCBs [SIO / DIO e. g.]