User manual

42 Chapter 6 Operating Instructions
NXr UPS Module And Parallel System 30kVA ~ 200kVA User Manual
Maintenance switch
Figure 6-2 Location of maintenance switch of 30kVA (NXr 30K) ~ 160kVA UPS
Maintenance switch
Figure 6-3 Location of maintenance switch of 200kVA UPS
6.2 UPS Startup Procedures
It is assumed that the installation is complete, the system has been commissioned by authorized personnel, and the
external power isolators are closed.