User manual
Chapter 3 Installation Of Parallel System 23
NXr UPS Module And Parallel System 30kVA ~ 200kVA User Manual
3.2.1 Cabinet Installation
Position the UPS cubicles side by side and make connection as shown in Figure 3-2. The output distribution
consisting of external UPS output switches and maintenance bypass must be installed, as shown in Figure 3-2, to
facilitate maintenance and system testing.
Figure 3-2 Typical ā1+Nā system schematic diagram (with common input, separate battery and output/bypass distribution cabinet)