User manual
Chapter 1 Installation Of UPS Module 13
NXr UPS Module And Parallel System 30kVA ~ 200kVA User Manual
1.7.2 Battery Circuit-Breaker (BCB) Port
J6 is the BCB port. The port is shown in Figure 1-9 and described in Table 1-3.
12V
OL
GND
FB
DRV
J6
12V
12V
Figure 1-9 BCB port
Table 1-3 BCB port description
Position Name Description
J6.1 DRV BCB driver signal – for BCB UV coil when used
J6.2 FB BCB aux contact closed to J6.3 when BCB is open
J6.3 GND Power ground
J6.4 OL BCB on line – enables J6.1 and J6.2 (when J6.4 is closed to J6.3)
The connection between the BCB port and BCB is shown in Figure 1-10.
电池开关
BCB
J10
OL
GND
FB
DRV
Aux-N.O.
Aux-N.O.
J6
Aux_N.O.
Aux_N.O.
BCB
Figure 1-10 Connection between BCB port and BCB
1.7.3 Maintenance Switch And Output Switch State Port
J9 is the maintenance switch and output switch state port. The port is shown in Figure 1-11 and described in Table
1-4.
EXT-S
CAB-S
CAB-S
J9
EXT_Q3
IN_S
GND
EXT_OUT
Figure 1-11 Maintenance switch and output switch state port
Table 1-4 Description of maintenance switch and output switch state port
Position Name Description
J9.1 EXT_Q3 External maintenance bypass (EBP) switch – Aux Contact closed to J9.4 when
EBP is open.
J9.2 IN_S J9.2 shorted to J9.4 when Internal maintenance switch is closed
J9.3 EXT_OUT
External output isolator (EOI) Aux Contact closed to J9.4 when EOI is closed.
J9.4 GND Power ground
Aux contact is open
when BCB is closed