Installation Manual
NetSure
™
9500 120kW 400V DC Power System
Installation Manual, IM584001200 (Issue AA, April 14, 2014)
Spec. No: 584001200 Code: IM584001200
Model No: 9500 Issue AA, April 14, 2014
[ii]
Cable Routing ............................................................................................................................................................. 4
Torque ........................................................................................................................................................................ 4
Electrical Connections to Power Module/Bay (584001200 List 01) .............................................................................. 4
Power Module/Bay Rack Frame Grounding/Earthing Connection ........................................................................ 4
Power Module/Bay HRMG Connection ................................................................................................................ 4
Power Module/Bay AC Input Power and AC Input Equipment Grounding/Earthing Connections.......................... 5
Power Module/Bay DC Load Distribution Connections (if DC distribution panel installed) ................................... 5
Power Module/Bay IB2 (ACU+ Controller Interface Board P/N MA4C5U31) Connections ..................................... 6
Power Module/Bay Temperature Probe Connections .......................................................................................... 6
ACU+ Controller Ethernet Connection ............................................................................................................... 11
Power Module/Bay External EPO (Emergency Power Off) Connections .............................................................. 11
Power Module/Bay Battery Breaker Alarm/Shunt Trip Connections ................................................................... 12
Power Module/Bay Battery Shunt Connections ................................................................................................. 12
Power Module/Bay Battery Connections ........................................................................................................... 12
Electrical Connections to Distribution Module/Bay (584001200 List 07) ................................................................... 15
Distribution Module/Bay Rack Frame Grounding/Earthing Connection ............................................................. 15
Distribution Module/Bay Distribution Panel List 21HA Connections .................................................................. 15
Electrical Connections to Battery Cabinet (584001200 List 90, 91, 92, 93) ............................................................... 17
Installing the Rectifier Module ............................................................................................................................. 17
System Startup .................................................................................................................................................... 18
Important Safety Instructions ................................................................................................................................... 18
Initial Preparation ..................................................................................................................................................... 18
Initially Starting the System ...................................................................................................................................... 18
ACU+ Controller Initialization ................................................................................................................................... 20
Verifying the Configuration File ................................................................................................................................ 21
Changing Battery Capacity Rating in the ACU+ ......................................................................................................... 21
Checking Basic System Settings ................................................................................................................................ 21
Configuring the ACU+ Identification of Rectifiers ...................................................................................................... 22
Checking the EPO (Emergency Power Off) Circuit (if connected) .............................................................................. 23
EPO (Emergency Power Off) Function ................................................................................................................ 23
Checking System Status ........................................................................................................................................... 23
Final Steps ................................................................................................................................................................ 23
NetPerform™ Optimization Services (North America) ......................................................................................... 24
NetPerform™ Optimization Services (EMEA) ....................................................................................................... 25