User's Manual

Table Of Contents
Section 5877 User Instructions
Issue AQ, January 15, 2013 Spec. No. 582140000 (Models 802NLDB, 802NLEB and 802NL-B)
Page 3-24 Chapter 3. System Operating Procedures
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
b) In a Power Share application where the New Power System is taking only part of
the load (operating continuously at the current level equivalent to the
programmed “PS Initial Capacity Limit” percentage) and the rectifiers in the
Existing Power System are taking the rest of the load, use an external dry load
bank of sufficient capacity to increase the load in order to exceed the total
capacity of the rectifiers in the Existing Power System (or shut down some of the
rectifiers in the Existing Power System if the capacity of the external dry load
bank is not sufficient).
1) Verify that the New Power System starts taking the additional load as soon
as the total capacity of the rectifiers in the Existing Power System is
exceeded.