Installation Instructions

Installation Instructions Section 5876
Spec. No. 582140000 (Models 802
NLDB, 802NLEB and 802NL-B) Issue AT, April 26, 2013
Chapter 4. Making Electrical Connections Page 4-49
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Figure 4-17
AC Input and AC Input Ground Connections
(Lists 2 and 12 Bays, with PDSC)
Dual AC Feed
Note: Remove factory installed
shorting plates. See previous
page for illustration with
shorting plates installed.
Feed #1
A
Feed #1
B
Feed #1
C
Feed #2
A
Feed #2
B
Feed #2
C
Rear View
Optional Bolt-On PCU
AC Input Service Cabinet
Ensure that each bay is wired into the PDSC as detailed in
"Chapter 2. Placing the Bays and Installing Internal/External Busbars".
Frame Ground Nuts
to Secure Lugs and Lug
Mounting Hardware
(3/8-16 on 1" Centers)
(Accessed from Inside Cabinet)
3/8-16 x 1.25 Studs (12) on 1" Centers
for Installation of Customer Provided Lugs
Recm. Torque
3/8" Hardware
using Belleville
Lock Washer
180 in-lbs, using
flat washer and
lock washer
300 in-lbs.
480VAC (List A) or 208VAC (List B), 3 Phase, 60Hz
Two Feeds:
Feed #1 Powers PCU #1, #3, #5, #7, #9
Feed #2 Powers PCU #2, #4, #6, #8, #10