Installation Guide
Installation Guide Section 5957
Spec. No. 582140000 (Models 802NLDB, 802NLEB and 802NL-B) Issue AM, March 26, 2014
Page 9
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Installing Power/Distribution Bay to Power/Distribution Bay
Negative and Positive Busbar Links (WITH PDSC)
Busbar Link
Cover Shield
(installed after
all mounting
and electrical
connection
procedures
are completed)
Slide Busbar Links Under
Bays' Upright Channels.
Use Bolt Holes as Shown
in Illustration.
Torque to 180 in-lbs.
3/8-16 x 1-1/2" Bolt
3/8" Belleville Lock Washer
3/8" Belleville Lock Washer
(concave side of Belleville
Lock Washers face each other)
3/8” Hardened Flat Washer
(10 Places per Busbar)
POSITIVE
BUSBAR LINK
NEGATIVE
BUSBAR LINK