Application Guide
Section 5876 Installation Instructions
Issue AT, April 26, 2013 Spec. No. 582140000 (Models 802
NLDB, 802NLEB and 802NL-B)
Page 3-4 Chapter 3. Installing Distribution Devices and MCA/LMS Circuit Cards
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Figure 3-1
Installing 218 Circuit Breakers, TPL Fuseholders, and Bullet Nose-Type
Device Mounting Assemblies into Power/Distribution Bays
3-Pole
1 12 13 24
25 36 37 48
Distribution Device
Top Mounting Studs
Distribution Device
Power System Connectors
Distribution Device
Bottom Mounting Studs
Distr.
Bus
#2
Distr.
Bus
#1
Right Half
Distr. Bus
#1 and #2
Left Half
Distr. Bus
#1 and #2
Belleville Lock Washer
3/8-16 Nut
Torque to
180 in-lbs
Torque to
84 in-lbs
Flat Washer
Lock Washer
1/4-20 Nut
Bullet Nose-Type Device
Mounting Assembly
Note: Each half of each bus MUST be populated
with distribution devices from left-to-right,
without skippi
ng any distribution device mounting
positions within each half.
Front View
TPL Fuseholders
218 Circuit Breakers
1-Pole 2-Pole 3-Pole 4-Pole
2-Pole 3-Pole