Application Guide

Section 5876 Installation Instructions
Issue AT, April 26, 2013 Spec. No. 582140000 (Models 802
NLDB, 802NLEB and 802NL-B)
Page 2-66 Chapter 2. Placing the Bays and Installing Internal/External Busbars
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Figure 2-50
Power/Distribution Bay External Top-Mount Vertical Busbar Assembly (P/N 554874)
Assembly Procedure Step 6
(6) 3/8-16 x 1-1/4” Bolt, P/N 227646800 Torque to 180 in-lbs.
(6) 3/8” Belleville Washer, P/N 214825000
(6) 3/8” Flat Washer, P/N 214204100
(1) Vertical Landing Positive Busbar, P/N 548003
(2) 5/8-11 x 1” Bolt, P/N 227655100 Torque to 715 in-lbs.
(2) 5/8” Lock Washer, P/N 215111800
(2) 58” Flat Washer, P/N 214201300
STEP 6
Install “Vertical Landing Positive Busbar”
onto “Main Positive Busbar”.
Rear Top
of Bay
Assembled
View