Application Guide
Section 5876 Installation Instructions
Issue AT, April 26, 2013 Spec. No. 582140000 (Models 802
NLDB, 802NLEB and 802NL-B)
Page 2-62 Chapter 2. Placing the Bays and Installing Internal/External Busbars
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Figure 2-46
Power/Distribution Bay External Top-Mount Vertical Busbar Assembly (P/N 554874)
Assembly Procedure Step 2
STEP 2
Install “Support Bar” and “Related
Hardware” onto Top of Bay.
(2) Threaded Insulator, P/N 245857200 Torque to 715 in-lbs.
(2) 5/8-11 x 7” Threaded Rod, P/N 334317000
(2) Support Bar Clip, P/N 351322300
(2) Support Bar, P/N 237790100
(2) Support Bar Clip, P/N 351322300
(2) 5/8” Lock Washer, P/N 215111800
(2) 5/8” Hex Nut, P/N 228580900 Leave 1/2” space between
bottom of nut and top of bay.
Rear Top
of Bay
Assembled
View