Application Guide

Installation Instructions Section 5876
Spec. No. 582140000 (Models 802
NLDB, 802NLEB and 802NL-B) Issue AT, April 26, 2013
Chapter 2. Placing the Bays and Installing Internal/External Busbars Page 2-61
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Figure 2-45
Power/Distribution Bay External Top-Mount Vertical Busbar Assembly (P/N 554874)
Assembly Procedure Step 1
STEP 1
Install “Main Positive Busbar” onto
Bay Positive Busbar.
(1) Main Positive Busbar, P/N 554877
Note: Apply Electrical Anti-Oxidation Compound
to busbar mating surfaces.
(12) 3/8” Flat Washer, P/N 214204100
(12) 3/8” Belleville Washer, P/N 214825000
(12) 3/8-16 Hex Nut, P/N 228567100
Hand-tighten only.
Note: Concave side of Bellville washer faces
busbar; convex side faces hex nut.
Rear Top
of Bay
Assembled
View
Do the following first before assembly:
1. Remove 55
2402 (1) and 116638 (4) from Bay.
2. Mount 554880 to the 554877 with 116638 (3).