Application Guide

Section 5876 Installation Instructions
Issue AT, April 26, 2013 Spec. No. 582140000 (Models 802
NLDB, 802NLEB and 802NL-B)
Page 2-60 Chapter 2. Placing the Bays and Installing Internal/External Busbars
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
INSTALLING POWER/DISTRIBUTION BAY EXTERNAL TOP-
MOUNT VERTICAL BATTERY INPUT BUSBAR ASSEMBLY, P/N
554874 (IF FURNISHED)
Tools and Material Required to Install the Busbar Assembly
a) 9/16" Wrench (for 3/8" Hardware)
b) 15/16" Wrench (for 5/8" Hardware)
c) Channel Locks
d) Anti-Oxidation Compound
e) Torque Wrench
Installation Procedure
Danger: Before performing this procedure, ensure that the Power/Distribution Bay
is COMPLETELY DISCONNECTED from all power sources.
Note: Apply electrical anti-oxidation compound to mating surfaces of busbars before
connecting together.
Assemble the Busbar Kit to the top of the bays as shown in Figure 2-45 through Figure
2-52
.