Application Guide

Installation Instructions Section 5876
Spec. No. 582140000 (Models 802
NLDB, 802NLEB and 802NL-B) Issue AT, April 26, 2013
Chapter 2. Placing the Bays and Installing Internal/External Busbars Page 2-47
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Figure 2-33
Power/Distribution Bay External Top-Mount Ground (Load Return) Busbar Assembly (P/N 514690 or 514691)
Assembly Procedure Step 2B
* Use "Spacer Busbars" or "Spacer Insulators"
on end bays or stand-alone bays. For multiple
bays, use "Spacer Busbars" and move out to
'bridge' between busbars of both Assemblies
(see Assembled View).
STEP 2B
Install "Busbars".
(Bolt Hole Identification)