Application Guide

Installation Instructions Section 5876
Spec. No. 582140000 (Models 802
NLDB, 802NLEB and 802NL-B) Issue AT, April 26, 2013
Chapter 2. Placing the Bays and Installing Internal/External Busbars Page 2-29
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Figure 2-17
Power/Distribution Bay External Top-Mount Horizontal Busbar Assembly (P/N 554873)
Assembly Procedure Step 4
Note: Concave Side of Belleville Washer Faces
Busbar, Convex Side Faces Bolt Head.
Belleville Washer install between Bolt Head
and Flat Washer.
(1) Horizontal Landing Negative Busbar, P/N 514434
Note: Apply Electrical Anti-Oxidation Compound
to Busbar Mating Surfaces.
(6) 3/8” Belleville Washer, P/N 214825000
(6) 3/8-16 x 1-1/4” Bolt, P/N 227646800
(6) 3/8" Flat Washer, P/N 214204100
Assembled
View
Rear Top
of Bay
STEP 4
Install “Horizontal Landing Negative Busbar”
onto “Main Negative Busbar”.
Torque to 180 in-lbs.