Application Guide
Installation Instructions Section 5876
Spec. No. 582140000 (Models 802
NLDB, 802NLEB and 802NL-B) Issue AT, April 26, 2013
Chapter 4. Making Electrical Connections Page 4-7
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
DISTRIBUTION ONLY BAY BAT RTN CONNECTION TO
SYSTEM MONITORING AND CONTROL SECTION
Procedure
1) Connect BAT RTN to the terminal indicated in Figure 4-2. Use 18-16 AWG wire
for this connection.
Figure 4-2
BAT RTN Connection to Distribution Bay System Monitoring and Control Section
MCA BATTERY CHARGE DIGITAL TEMPERATURE
COMPENSATION PROBE CONNECTION
Mounting Procedure
1) If furnished, mount the MCA Battery Charge Digital Temperature Compensation
Probe to any suitable surface located near the battery. One 1/4-inch hole is
provided to mount the probe.
Connection Procedure
1) If furnished, connect the MCA Battery Charge Digital Temperature Compensation
Probe to the connector labeled TEMP located in the Primary Power/Distribution
or Power Only Bay. Refer to Figure 4-3 for location.
MCA EXTERNAL CAN BUS PORT CONNECTION
For future use.
Front Door Removed in
Illustration for Clarity
Distribution Only Bay
Connect BAT RTN to this Terminal