Application Guide
Installation Guide Section 5957
Spec. No. 582140000 (Models 802NLDB, 802NLEB and 802NL-B) Issue AM, March 26, 2014
Page 43
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Power/Distribution Bay
External Top-Mount Vertical Battery Input Busbar Assembly (P/N 554874)
Assembly Procedure Step 6
(6) 3/8-16 x 1-1/4” Bolt, P/N 227646800 Torque to 180 in-lbs.
(6) 3/8” Belleville Washer, P/N 214825000
(6) 3/8” Flat Washer, P/N 214204100
(1) Vertical Landing Positive Busbar, P/N 548003
(2) 5/8-11 x 1” Bolt, P/N 227655100 Torque to 715 in-lbs.
(2) 5/8” Lock Washer, P/N 215111800
(2) 58” Flat Washer, P/N 214201300
STEP 6
Install “Vertical Landing Positive Busbar”
onto “Main Positive Busbar”.
Rear Top
of Bay
Assembled
View