Application Guide

Section 5957 Installation Guide
Issue AM, March 26, 2014 Spec. No. 582140000 (Models 802NLDB, 802NLEB and 802NL-B)
Page 8
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Installing Power/Distribution Bay to Power/Distribution Bay
Negative and Positive Busbar Links (WITHOUT PDSC)
3/8-16 x 1-1/2" Bolt
3/8" Belleville Lock Washer
3/8" Belleville Lock Washer
(concave side of Belleville
Lock Washers face each other)
3/8Hardened Flat Washer
(10 Places per Busbar)
POSITIVE
BUSBAR LINK
NEGATIVE
BUSBAR LINK
Slide Busbar Links Under
Bays' Upright Channels.
Use Bolt Holes as Shown
in Illustration.
Torque to 180 in-lbs.