Installation Manual

Emerson Network Power
Buried Distribution Products
631-200-108
Version B, March 18, 2013
Page 10 of 14 Proprietary Information Outside Plant Equipment
Step 10: Use the
3
/
8
-inch mounting hardware from the loose parts kit to secure the stakes to
the enclosure. The stakes are to be mounted on the inside of the enclosure. (See
Fig. 10)
Step 11: Backfill around the outside of the enclosure with soil. At final grade, the top 5
inches (13 cm) of the lower cover should be above ground, and the bottom 4 inches
(10 cm) should be below ground.
Step 12: Place gravel (preferred) or backfill in the enclosure base to grade, or as local
practices apply.
3.4 Grounding
Perform the step to complete the installation of the enclosure:
Step 1: Perform all bonding and grounding procedures according to local practices. A
ground bar is provided in the base of the enclosure.