Page 6 of 8 Proprietary Information Outside Plant Equipment
Step 6: Per local practices, install a run of 1-inch (2.5 cm) trade size conduit from
the adjacent power pedestal to the large hole on the bottom of the
junction box for the incoming AC power (shown in Fig. 6), and run wiring
from the adjacent power pedestal.
Step 7: Per local practices, connect the wiring for the incoming AC power and for
the DSLAMs (and other AC power applications) to the junction box’s
terminal block and ground bar (shown in Fig. 10).
Step 8: When you have completed the wiring, replace the junction box’s cover (as
shown in Fig. 11), and secure it by using a 216-type tool to tighten the
cover’s cup SEMS bolt.
ter
ter
minal
minal
bloc
loc
k
terminal
block
ground
round
bar
bar
ground
bar
Fig. 10 : The Terminal Block
and Ground Bar
C
a
u
t
i
o
n
:
Caution:
A
C
c
i
r
c
u
i
t
s
a
r
e
l
i
v
e
AC circuits are live
. P
l
e
a
s
e
e
n
s
u
r
e
t
h
a
t
t
h
e
Please ensure that the
b
r
e
a
k
e
r
f
o
r
t
h
e
c
i
r
c
u
i
t
b
e
i
n
g
w
i
r
e
d
is
i
n
breaker for the circuit being wired is in
t
h
e
"
O
F
F
"
p
o
s
it
i
o
n
a
t
t
h
e
p
o
w
e
r
s
o
u
r
c
e
the "OFF" position at the power source
b
e
f
o
r
e
a
n
y
c
o
n
n
e
c
t
i
o
n
s
a
r
e
m
a
d
e
before any connections are made
.
C
a
u
tion
:
A
C
circu
its a
re liv
e
. P
le
a
se
en
su
re th
a
t th
e
b
rea
k
e
r for th
e
circu
it b
ein
g
w
ire
d
is in
th
e
"O
F
F
" p
os
itio
n
a
t th
e p
o
w
er sou
rce
b
e
fo
re a
n
y
co
n
n
e
ction
s
a
re m
a
d
e.
C
a
u
t
i
o
n
:
A
C
c
i
r
c
u
i
t
s
a
r
e
l
i
v
e
.
P
l
e
a
s
e
e
n
s
u
r
e
t
h
a
t
t
h
e
b
r
e
a
k
e
r
f
o
r
t
h
e
c
i
r
c
u
i
t
b
e
i
n
g
w
i
r
e
d
i
s
i
n
t
h
e
"
O
F
F
"
p
o
s
i
t
i
o
n
a
t
t
h
e
p
o
w
e
r
s
o
u
r
c
e
b
e
f
o
r
e
a
n
y
c
o
n
n
e
c
t
i
o
n
s
a
r
e
m
a
d
e
.
Fig. 11 : Securing the Junction Box Cover