User`s guide
Copyright © 2004 EIM COMPANY, INC. • 13840 PIKE ROAD • MISSOURI CITY, TX. 77489
Page 19
Controlinc 1746-C (Version 5.21) Network Master Users Guide (2004-11-18)
4.1.4. Diagram Describing Relationship Between Scan Period & Diagnostic
Scan
This example demonstrates the relationship between the diagnostic scans, scan periods, the current
scan period, the previous scan period.
This example: a scan period value of 10 and 25 valves on the network. This means that all the valves
on the network will be scanned 10 times before the scan period is over … and before the next
diagnostic scan is performed.
Current
Scan Period
(so far, 5 network scans
completed)
Previous
Scan Period
(all 10 network scans of 25
valves completed)
Current time History
Individual
network scans
Diagnostic
scan
Diagnostic
scan