Case Studies
A Customer Success
from the Experts in
Business-Critical Continuity™
torunCFDcalculationseverythreetosixmonths,
incorporating changing data captured from new
thermistors,branchcircuitmonitoringandothertools.
“SeeingEmerson’sCFDdesignaheadoftimewas
important. It made everyone more confident in what
weweredoing,”Lauterbachsays.“ThefirsttimeIsaw
thatCFDmodeling,the‘wow’factorwasthere.It’sa
greattoolfromadesignperspective.”
ThomasGooch,theLiebertRepresentativefrom
ComputerSupportProducts,Inc.,saystheearly
CFDmodelingshowedBayCarearelationshipwith
Emersongoeswellbeyondproducttechnology.
“It shifted our role from product provider to really
workinghand-in-handwiththedesignteam,”Gooch
says. “We all worked together to decide where the
bladeserverswouldgo,wheretheprecisioncooling
units would go, where we needed perforated panels,
and other decisions affecting airflow and cooling
efficiency. It truly was a team approach, and that
waspossiblebecauseofthemodelingwedidin
the
beginning.”
Lauterbachaddsthateverydecisionwasmadewith
growthpotential,bestpracticesandBayCare’sspecific
objectivesinmind.Theattentiontodetailshowsin
every inch of the new data center.
BayCare used the same discipline to solve its power
needs.Itchosemultiple500kVALiebertSeries610
UPSsystemsbecauseofthereliability,easeofusethat
comeswiththefrontpaneldesign,andtheabilityto
transfer and manage power as needed.
Thenewfacilityhasintegratedlights-outcapability,
allowing remote control of servers from anywhere
in the world. The virtually people-free facility
doesn’t need a command center on the raised
floor,conservingvaluablespace.Italsominimizes
disruptionscausedbyhumanerror,andallows
managers to monitor and control the data center
environmentremotelyusingtoolssuchastheLiebert
iCOM environmental control system.
TheLiebertiCOMcontrolsystemprovidesadvanced
diagnostic and maintenance support for data
centerequipment
andenablesmultiple
unitsto
communicate and work together as a system to
precisely control temperature and humidity across
BayCare used the same discipline to solve its power
needs. It chose multiple 500 kVA Liebert Series 610
UPS systems because of the reliability, ease of use
that comes with the front panel design, and the
ability to transfer and manage power as needed.
Doug Lauterbach, director of IS Imaging Services (pictured)
BayCare Health System