Unit installation

Water Connections
40
8.4 Chilled Water Connections: Chilled Water Units
Figure 35 Chilled water connections
Refer to Figure 36 when performing these installation steps:
Use copper tubing or steel pipe.
Place the tubing on supporting saddles.
Insulate both tubes
Install shutoff ball valves on the inlet and outlet pipes to ease maintenance.
Install thermostats and pressure gauges on the inlet and outlet pipes.
Install a water drain tap at the lowest point in the circuit.
Fill the circuit with water/glycol.
Figure 36 Chilled water circuit
Top Connections
Bottom Rear Connections
Tubing Support
Water Drain Tap
Ball
Valves
Thermostat
Pressure
Gauge
Insulation
Liebert CRV