Piping
Liebert
®
DCP
24
Figure 24 Liebert XDK-W
bleed valve
3.8 Checklist for Proper Installation
___ 1. Unpack and check received material.
___ 2. Position the Liebert DCP and secure to the floor.
___ 3. Wire high-voltage connections.
___ 4. Wire low-voltage connections.
___ 5. Connect building chilled water piping to the Liebert DCP.
___ 6. Connect Liebert DCD
/Liebert XDK-W piping to the Liebert DCP.
___ 7. Make sure air vents are installed at high-point of the system.
___ 8. Make sure isolation valves are installed on the mains and branch piping.
___ 9. Pressure test air.
___ 10. Fill the system with water.
___ 11. Bleed air out of the system.
___ 12. Pressure test fluid.
___ 13. Check for water leaks.
Bleed
Valve