User's Manual
Installation
Liebert
®
DCP
™
14
Figure 14 Connecting the remote temperature/humidity sensors
E1
P22 P38
P39
P53
P52
P54
P51
P63
P11
P12
P13
P7
P32
P8
P40
P33
P34
P36
P35
E5
E1 E2 E3 E4
OFF ON
2
1
4
3
6
5
P64
P3
P65
P1
P2
P2 P4
P3P1
P66
P67
1
2
3
TB1
P18
SW2
P68
P66
P67
P64
P65
P61
P4
P43
P41
P24
P45
P4
P78
See
Note 2
See
Note 4
See Note 4
See Note 5
See Note 5
Liebert XD
Cooling Module
Liebert XD
Cooling Module
See
Note 9
See Note 7
Remote T/H Sensor BRemote T/H Sensor A
See Note 3
See Note 8
See Note 8
CAN Iso
Adaptor
Liebert iCOM Microprocessor
and I/O Board
Not
Used
Cable A
Cable B
Ribbon
Cables
Liebert IntelliSlot
Power Supply
Red Crossover
Ethernet Cable
See Table for
Plug Assignments
CAN
Cable
Termination
Plug
CAN Ground
Coupler
CAN Ground
Coupler
Crossover Coupler
See Note 6
Unit Display
(Rear View)
Control
Fuse
Board
24VAC Nominal
T1 Unit Control
Transformer
T6 Isolation
Transformer
Liebert IntelliSlot 1
Liebert IntelliSlot 2
1. See unit electrical schematic, installation and user manuals.
2. Cable “A” provided with each unit. Liebert IntelliSlot-based
communications - Cable “A” is preconnected to P65
on the microprocessor and input/output board and P65 on the
Liebert IntelliSlot power supply non-Liebert IntelliSlot-based
communications.
3. Install applicable Liebert IntelliSlot cards.
4. Both cables (P64 and P66) are required.
5. It is not necessary to connect the ground coupling on the end of the
cable connected to Sensor “A” or Sensor “B.”
6. A crossover coupler is provided for unit-to-unit (U2U) networking. Unplug
the red cable from P64 on the microprocessor and input/output board
and connect it to one side of the crossover coupler. The first customer
connection point is to P64 on the microprocessor and input/output board.
The second customer connection point is to the other side of the crossover
coupler. This connects the microprocessor and input/output board and
display to the private U2U network.
7. The remote sensors are interchangeable as to which connects to the Liebert
XD cooling module and which connects to P2 on CAN Iso.
8. Field-install cables with factory-installed ferrite beads (when provided,
typically two places). Each cable must make three passes through the
ferrite bead. Locate the ferrite bead on top of the electric box. See
the instruction sheet provided with the cable assembly.
9. Factory-installed ferrite bead (when provided). The cable passes through
the ferrite bead three times.
302211
Rev. 3
P66
P67
P66
P67
P66
P67
P66 P67