Instruction Manual

Maintenance and Troubleshooting
April 2014
Instruction Manual
D103176X012
70
Figure 6‐3. Installation of Conductive Gasket
CONDUCTIVE
GASKET
TERMINAL
BARRIER
W8844
10. Tighten the self-tapping screw (key 42) on the Interconnect Board.
11. Install the Primary Shield (key 37) with three screws.
12. Recalibrate the instrument and install the cover.
Replacing the I/P Converter
The I/P converter is fastened to the mounting frame. On the I/P mounting surface is a replaceable screen with O-ring
seal.
Note
After I/P converter replacement, calibrate the digital valve controller to maintain accuracy specifications.
Removal
1. Remove the main cover.
2. Remove three screws that hold the EMI shield and remove the shield (refer to figure 6‐1).
3. Remove the three screws holding the electronics board to the mounting frame.