D Check with your process or safety engineer for any additional measures that must be taken to protect against process
media.
Valve parts are subject to normal wear and must be inspected and replaced as necessary. Inspection and maintenance
frequency depends on the severity of service conditions. This section includes instructions for trim maintenance,
packing maintenance, and packing lubrication. All maintenance operations may be performed with the valve installed
in the pipeline.
Note
If the valve has ENVIRO‐SEALt live‐loaded packing installed (figure 8, 9, or 10), see the Fisher instruction manual entitled
ENVIRO‐SEAL Packing System for Sliding‐Stem Valves for packing instructions.
Trim Maintenance
Disassembly
Note
Whenever a gasket seal is disturbed by removing or shifting gasketed parts, install a new gasket upon reassembly. This is necessary
to ensure a good gasket seal.
Key number locations are shown in figure 11 or 12 unless otherwise indicated.
Figure 3. Valve Plug Assembly
STEM
DISK SEAT
DISK
VALVE PLUG
CAGE
CASTLE NUT
COTTER PIN
ETR OR EDR
NOTE:
ETR USES A SEAL RING (KEY 24) AND A BACKUP RING (KEY 25) (SEE FIGURE 11).