Instruction Manual
Instruction Manual
D103434X012
Installation
November 2014
11
Section 2 Installation2‐2‐
This section contains digital level controller installation information including an installation flowchart (figure 2‐1),
mounting and electrical installation information.
Figure 2‐1. Installation Flowchart
START
Factory
mounted on
249 sensor
Mount DLC3020f
to Sensor
Install Heat
Insulator
High
temperature
application?
Yes
No
Proceed to
Set Up and Calibration
Make Electrical
Connections
Power Device
Yes
No
Configuration: On the Bench or in the Field
Configure the digital level controller before or after installation in the field.
It may be useful to configure the instrument on the bench before installation to ensure proper operation, and to
familiarize yourself with its functionality.