Instruction Manual
Instruction Manual
D103221X012
D3 FloPro Valve
February 2014
3
Table 3. Valve Sizes and Connection Styles
VALVE
SIZE,
NPS
PORT DIAMETER, (INCHES)
THREADED RAISED FACE (RF) FLANGED
CL900 CL600
1 0.375, 0.75, 1 X X
2 0.375, 0.75, 1 X X
X = Available construction.
Educational Services
For information on available courses for Fisher D3 valves, as well as a variety of other products, contact:
Emerson Process Management
Educational Services - Registration
P.O. Box 190
Marshalltown, IA 50158-2823
Phone: 800-338-8158 or 641-754-3771
FAX: 641-754-3431
e-mail: education@emerson.com
Installation
WARNING
Always wear protective gloves, clothing, and eyewear when performing any installation operations to avoid personal
injury.
To avoid personal injury or property damage caused by bursting of pressure-retaining parts or by uncontrolled process
fluid, be certain the service conditions do not exceed the limits shown on the valve nameplate and in table 1. Use
pressure-relieving devices required by government or accepted industry codes and good engineering practices.
Check with your process or safety engineer for any additional measures that must be taken to protect against process
media.
If installing into an existing application, also refer to the WARNING at the beginning of the Maintenance section in this
instruction manual.
CAUTION
When ordered, the valve configuration and construction materials were selected to meet particular pressure, temperature,
pressure drop, and controlled fluid conditions. Responsibility for the safety of process media and compatibility of valve
materials with process media rests solely with the purchaser and end-user. Since some body/trim material combinations
are limited in their pressure drop and temperature ranges, do not apply any other conditions to the valve without first
contacting your Emerson Process Management sales office.
To avoid product damage, inspect the valve before installation for any damage or any foreign material that may have
collected in the valve body. Also remove any pipe scale, welding slag, or other foreign material from the pipeline.
1. Before installing the control valve assembly, inspect it for any damage and for any foreign material that may have
collected in the valve body.
2. Clean out all pipelines to remove scale, welding slag, and other foreign materials.