User's Manual
Installation
11
3.5 Power Distribution Unit Mounting
Power distribution units may be mounted multiple ways in the DCF Optimized Rack System rack.
They may be mounted on the rails or attached to mounting brackets:
• 42U full height PDU/cable management mounting brackets (4"W) (Part # 546076G1L)
• 48U full height PDU/cable management mounting brackets (4"W) (Part # 546077G1L)
3.6 Full-Height PDU/Cable Management Brackets
3.6.1 Install a Full-Height PDU/Cable Management Bracket
1. Position the full-height PDU mounting bracket for installation; refer to Figure 11 for placement.
The inside bottom flange of the PDU hanging bracket should rest on the flange of the frame
member at the top and bottom.
2. Hold the PDU bracket in place and insert and tighten the screws.
3.6.2 Reposition a Full-Height PDU/Cable Management Bracket
1. Loosen the screws in the top and bottom PDU hanging bracket.
2. Slide the full height pdu/cable management bracket along the frame member to the desired
location and tighten the screws.
3.6.3 Remove a Full-Height PDU/Cable Management Bracket
1. Loosen the screws in the top and bottom PDU hanging bracket.
2. Lift the bracket up so the hanging bracket clears the frame member and remove the full-height
PDU/cable management bracket from the DCF.
Figure 11 Full-height PDU/cable management brackets
PDU hanging bracket
clips on top of frame
member flange
Top and bottom ends of full-height PDU/
cable management brackets are identical,
permitting use on either side of the
cabinet; 4" wide
Full-height PDU/cable
management bracket
flange grips DCF frame