Figure 3-3. Diagram of correct 
(left) and incorrect (right) milling 
processes. Spot faced surface 
should be uniform on all sides. 
4. Using 1/4"-28 tap set, tap a pilot hole to a minimum depth of 0.25 
inches (250 mils) as illustrated in Figure 3-4.
Figure 3-4. Diagram showing a 
tapped pilot hole.
Epoxy Mount
1. If the equipment surface has a radius of curvature less than 4", it will 
be necessary to grind a flat surface approximately 1/2" in diameter. If 
the curvature radius is greater than 4", proceed to step 2.
2. Using the wire brush and plant-approved cleaner, clean and degrease 
the surface area.
3. Using A92016 2-part epoxy, spray activator onto mounting surface. 
Place a light coat of epoxy on surface of A212 mounting pad and hold 
firmly against machine spot face surface for 1 minute.
4. If adhesive does not setup within 1 minute, this is an indication that 
too much epoxy was applied or that the mounting surface was not 
prepared properly. Repeat installation steps 2 - 5.