Specifications
Reference Manual
MHM-97408, Rev. 2
June 2008
CSI 9420
3-6
Figure 3-3. Diagram of correct
(left) and incorrect (right) milling
processes. Spot faced surface
should be uniform on all sides.
4. Using 1/4"-28 tap set, tap a pilot hole to a minimum depth of 0.25
inches (250 mils) as illustrated in Figure 3-4.
Figure 3-4. Diagram showing a
tapped pilot hole.
Epoxy Mount
1. If the equipment surface has a radius of curvature less than 4", it will
be necessary to grind a flat surface approximately 1/2" in diameter. If
the curvature radius is greater than 4", proceed to step 2.
2. Using the wire brush and plant-approved cleaner, clean and degrease
the surface area.
3. Using A92016 2-part epoxy, spray activator onto mounting surface.
Place a light coat of epoxy on surface of A212 mounting pad and hold
firmly against machine spot face surface for 1 minute.
4. If adhesive does not setup within 1 minute, this is an indication that
too much epoxy was applied or that the mounting surface was not
prepared properly. Repeat installation steps 2 - 5.