Instruction manual

ControlWave Gas Flow Computer (GFC Plus) Instruction Manual (CI-ControlWave GFC Plus)
Revised Feb-2013 Installation 2-23
2.5 Installing the Rechargeable Battery and Solar Panel Harness
You must remove the rechargeable sealed lead-acid battery from its
shipping carton and install it on its mounting bracket within the
enclosure as illustrated in Figure 2-11.
Figure 2-11. Enclosure with Sealed Lead-acid Battery Installed
1.
Remove connector TB1 from the CPU/System Control Board.
2. Remove the lead-acid battery from its shipping carton.
3. Install the lead-acid battery (on end) as illustrated in Figure 2-11.
Note: Make sure the lead-acid battery is fully charged before
you install it.
4. Route the solar panel power wiring harness into the enclosure
through the solar power conduit fitting (see Item 5 of Figure 2-2).