Instruction manual
ControlWave Gas Flow Computer (GFC Plus) Instruction Manual (CI-ControlWave GFC Plus)
Revised Feb-2013 Installation 2-5
ControlWave Designer Manual (D5085) and the ControlWave
Designer Programmer’s Handbook (D5125).
2.2.1 Unpacking Components
Packaging
ControlWave GFC Plus gas flow computers ship from the factory with
all components wired and mounted except for the unit’s solar panel and
battery; these items are shipped separately.
2.2.2 Mounting the Housing
You must position the ControlWave GFC Plus vertically with the
transducer (MVT or GPT) at its base. Make sure the front of the
assembly is visible and accessible for service, installation, and for
operator access to the LCD display.
If your unit requires a solar panel, make sure there is sufficient
clearance. You can mount the solar panel to the same 2” pipe that
secures the unit.
Units with Multi-
Variable Transducer
(MVT)
You can mount units with an MVT directly to the main (meter run)
using a process manifold or you can mount them remotely to a panel, a
wall, or to a vertical 2 inch pipe clamped at the rear of the unit with
two clamps and four bolts.