User manual

CH Breaker Gateway (HHT) Software Setup • 7
5. Set Proof Type to ON Only. If the light
circuit is read as open when it should normal-
ly be closed, the 16AI board will send a "fail"
input relay to the controller. The Gateway
proofs both ON and OFF so that the user can
select the desired proof type as ALL Val-
ues, ON Only, or OFF Only. If any break-
er within a group fails the proof, the entire
group will fail the proof.
6. In the PROOF IN input, enter the virtual
board and point address of the proof input on
the gateway for the lighting group.
7. Set Proof Delay to a minimum of two
minutes. (0:02:00)
8. Press B(Next Tab) or A(Prev Tab) to
cursor over to C9: Outputs tab.
5.2.3.2. Light Outputs Setup
The Lighting Outputs Setup screen is where you will set
up the 8RO board and point numbers for each group for all
Lighting applications.
Refer to Table 7-1 to associate the inputs and outputs
with their corresponding group, board and point numbers.
For more information on setting up Lighting Schedules,
refer to your CPC site controller’s manual.
6 Software Setup
6.1. CH Breaker Gateway (HHT)
Connect the HHT to the Gateway board via the HHT
jack (refer to figure Figure 1-2 #1). Use the HHT to assign
individual breakers to a particular group.
Figure 5-3 - Lighting Proof Setup Screen
NOTE: Cycling power to all 48 breakers can
take up to 2 minutes. Choose a Proof Delay
that allows time for all breakers in the group
to switch ON and OFF.
NOTE: If a breaker is assigned to a group
that is not set up, a proof failure message will
occur.
Figure 5-4 - Lighting Outputs Setup Screen