Setup guide
Introduction
7
The configuration process for the I/O Expansion Rack is divided up into 3 parts.
Setting up the Hardware
This section gives you a quick overview of how to unpack the I/O Expansion Rack, install
the modular components, set the switches, and connect the cable between the rack and the
PC. References are included to the hardware manual for details of the individual steps.
Setting Configuration Parameters
This section describes how to establish communications with the rack using LocalView, and
how to use the Flash Configuration Utility to specify an Ethernet Port for the rack. This
section also discusses how to set up certain IP and application parameters.
Setting up the Host to Reference the I/O Expansion Rack
This section shows how to use the I/O Configuration Wizard in ControlWave Designer to
modify the ControlWave Project in the host controller, so that it can make use of the boards
in the I/O Expansion Rack.