Instruction manual

2-4 / Installation CI-ControlWaveLP
Figure 2-3 - ControlWaveLP Grounding Diagram
2.3 ControlWaveLP INSTALLATION/CONIGURATION
2.3.1 Overview of Configuration
An overview of the seven (7) steps required to configure a ControlWave Process Automation
Controller are provided below.
Step 1. Hardware Configuration
This involves unpacking the ControlWaveLP, mounting the unit, wiring I/O terminations,
making proper ground connections, connecting a communication cable to the PC
workstation and setting switches. To install and configure the ControlWaveLP follow
steps 1 through 10 below:
1. Remove the unit from its carton and install it at its assigned work site (see Section
2.2).
2. Configure the Jumpers on the FMI/OB Board (see Section 2.3.1).
3. Configure CPU Module Switches (see Section 2.x.x).
4. Configure/Connect appropriate communication port(s) (see Section 2.4.7). Connect
COMM. Port 1, 2, 3, 4 or 5 of the ControlWaveLP (depending on CPU Switch SW4
settings see Section 2.3.3.1) to a COMM. Port of a PC (typically PC COMM. Port 1).
Note: ControlWaveLP COMM. Port 1 can be used if CPU Switches SW4-3 and SW4-
8 are set OFF).
5. Install I/O wiring to each I/O Module (see Sections 2.4.1 through 2.4.4).
6. Install Watchdog Relay/MOSFET Switch wiring (see Section 2.4.5).
7. Connect Bulk DC Power to the unit’s PSSB Board (see Section 2.4.6).
8. Connect the unit to a known good Earth Ground (see Section 2.2.3)