User's Manual

b. Enter the port number.
c. Enter the password.
d. Click Install.
9. For an existing database installation, click the checkbox to Use Existing Database.
10. Click Next.
a. Entert the database IP address, listening port number and the database username and
password.
b. On the Installation Settings Confirmation screen, click Install.
11. The Installation Complete window will open.
To begin configuration of the Rack Power Manager software, click Done; see
Configuring the Rack Power Manager Software on page 8. A Security Alert dialog
box will appear containing certificate information and a warning that the generator of
the certificate is not trusted. This occurs because the Rack Power Manager server
certificate created when the server is installed is a self-signed certificate. You may
either import the certificate into the Rack Power Manager software client web browser
(choosing to trust the certificate) or obtain a server certificate from a Certificate
Authority (CA) trusted by the web browser.
To configure the Rack Power Manager software at a later time, click X (Cancel) in the
top right corner of the window.
Configuring the Rack Power Manager Software
After the Rack Power Manager software has been installed, it must be configured using a web
browser.
During configuration, you specify whether the computer will be a hub server or a spoke server.
If this is your first Rack Power Manager server installation, hub should be selected in the Select
RPM Server Role window. The hub server should be installed before any spoke servers are
added.
To configure the Rack Power Manager software:
1. If you are configuring the Rack Power Manager software during the installation process,
you have already clicked Done in the Launch Default Browser window.
If you quit after installing the Rack Power Manager software installation process (by
closing the window), select Start - Programs - Emerson Rack Power Manager - RPM
Software.
8Rack Power Manager Installer/User Guide