User Guide
Current State
To return to the current floor plan, select Current State at the bottom of the calendar pane or on the toolbar. The
view updates to reflect the current state of the floor plan, and returns to the current date on the calendar.
Project Properties
This option allows you to view all information for a selected project. The pane opens with tabs for details, tags,
tasks, status (conflicts) and the option to print the information to a .pdf file.
• The Details tab shows the project name, description and due date.
• The Tasks tab shows each change performed in a project with details of that change. The tasks can be
committed or deleted here by enabling the corresponding checkbox. This tab also shows committed tasks
and the date committed.
• The Tags tab shows a list of tags that are used to group projects. You can also add new tags or delete tags
here.
• The Status tab shows conflicts with other projects. The tab bar changes color according to the type of
conflict that occurred:
• Green - no conflict.
• Yellow - soft conflict.
• Red - hard conflict, cannot commit.
• The Print to .pdf icon is available to generate project information to a document. It contains the following
information:
• Project name.
• Status.
• Description.
• Due Date.
• Tags.
• Tasks.
• Status - Conflicts.
Exporting project properties to .pdf file
Exporting to a .pdf file allows you to create a .pdf in a report type document. It is available in all views and
requires Adobe Reader. The .pdf file shows the project properties, due date, tasks, tags and status.
To generate a project properties .pdf file:
1. Select Calendar, and select a Date.
2. Select a Project in the list.
3. Select the Project Properties pane.
4. Click the .pdf icon at the bottom of the screen.
-or-
122 Data Center Planner Installer/User Guide