Technical Specifications

ASCO Power Technologies, Florham Park, New Jersey 07932. 800-800-ASCO
www.EmersonNetworkPower.com/ASCO
8-2014 6 Publication 3279
Generator Run Time Management. Automatically balances running time on
generators, or set to intentionally unbalance running hours to stagger
maintenance times.
F. Alarm and Status Indicators
Alarm and status indicators per engine-generator controller shall include:
Controls in Auto
AC Control Power
Generator CB Status
Sync Failure
Load Bus Energized
Alarm and status indicators engine-generator indicator panel shall include:
Off/Cooldown
Engine Fault
Priority 2 Load Status (optional)
Priority 3 Load Status (optional)
Priority 4 Load Status (optional)
Power Management Status (optional)
PART 3 DESCRIPTION OF OPERATION
The equipment shall conform to the operational description in the PCS 336 User Manual.
PART 4 ACCESSORIES AND FACTORY WITNESS TEST
4.1 Witness Test (optional)
An inspection and witness test of the equipment prior to shipment shall be scheduled in advance
with the factory.
PART 5 INSTALLATION ASSISTANCE
The manufacturer of the generator control equipment shall provide the services of a satisfactorily
trained technician to provide installation assistance.