Technical Specifications
ASCO Power Technologies, Florham Park, New Jersey 07932. 800-800-ASCO
www.EmersonNetworkPower.com/ASCO
8-2014 2 Publication 3279
1. Elevation drawings with shipping splits identified and estimated weights.
2. Outline drawings showing conduit entry areas and anchoring information.
3. Single line diagram.
4. User Manual (including description of operation).
5. Complete bill of material listing items by manufacturer’s name, part number and
description.
B. [Optional: One complete set of as-installed, engine and switchboard interconnect
drawings, and material summary shall be provided following installation.]
C. Electronic documentation shall include:
1. Complete Drawings, Layouts and Schematics.
2. Material Summary.
3. Component Instruction.
4. User Manual (including Description of Operation).
5. Installation Manual.
1.6 Testing
The equipment shall be fully assembled for factory testing. Testing shall include, but not be
limited to three phase 5A secondary injection testing of the current circuits. The Closed
Transition Transfer Switch mechanisms supplied shall be electrically and mechanically tested.
A narrative of the system operation shall be provided and shall be utilized when testing the
equipment. A certified factory test report shall be furnished to verify system testing if requested.
1.7 Warranty and Service
A. Manufacturer shall warrant the equipment for eighteen months subject to terms and
conditions of manufacturer’s current warranty publication.
B. Manufacturer shall have an established network of service centers capable of servicing
the equipment.
C. Service representatives shall be on call 24 hours a day, 365 days a year. Personnel shall
be factory trained and certified in the maintenance and repair of the specified equipment.
D. Post-warranty service contracts shall be made available to the owner by the manufacturer
to provide scheduled maintenance and/or emergency repair of the equipment.
1.8 General Requirements
A. Switchboard Enclosure