User Guide

Commissioning Assistant
31-9
31.4.9. Check Intertier Screen
Figure 165. Check Intertier (Comm Asst)
Click the Check Intertier button. Measure the intertier voltage, type the value in the
Measured Value field, then press <Enter>. If the measured value agrees with the calculated
value in the monitor, the Status area indicates Passed. The list dynamically changes to show
all intertiers and charger cables. You only have to verify one intertier per DCM. If the
measured value fails, calibrate the monitor to the measured value by clicking the Cal button.
31.4.10. Base Data - Cell Voltage Screen
Figure 166. Base Data - Cell Voltage (Comm Asst)
Click the Base Data - Cell Voltage button. Data on this screen readily identifies wiring
problems. To save the data, click the Save Voltages button. The voltage data is saved as the
baseline float voltage readings, and the baseline voltages appear in the commissioning report.