1.7 Pre-installation considerations
Pipeline equipment code compliance, ANSI, ASME, etc.
Proper Inlet/outlet meter tube piping for reasonable stable flow to the settling chamber
(first meter tube spool upstream of the meter).
Electrical safety compliance; UL,ULC, ATEX, IECEx etc.
Civil and structural good practices compliance
Contractual agreements or governmental compliance (or both)
In-situ performance test procedures
In-situ meter calibration
Field tested advanced meter health and flow dynamics diagnostics
Data collection and retention procedures