Install Instructions
From
Evaporator
To
Compressor
45° Elbow
Copper Sweat
45° Street Elbow
Copper Sweat
www.emersonclimate.com/owcontrols
STAS Steel Take-Apart Shell with Replaceable Filter-Drier Blocks and Filters
STAS Steel Take-Apart Shell with 
Replaceable Filter-Drier Blocks and Filters
Instruction Sheet
PA-00105
October 2011
11911 Adie Road P.O. Box 411400 St. Louis MO 63141 USA CUSTOMER SERVICE (314) 569-4666   
Safety Instructions
1.  Read Installation Instructions thoroughly. Failure to 
follow instructions may result in drier failure or system 
damage.
2.  Do not remove blocks from can until just prior to instal-
lations. Early removal could result in contamination of 
the desiccant from surrounding atmosphere.
3. Checkarrowforcorrectowdirection.Reverse ow 
may cause internal damage.
4. CAUTION: In a severely contaminated system avoid 
breathing acid vapors, and avoid contact with the skin 
or clothing from contaminated refrigerant. Dispose the 
contaminated refrigerant in a caustic solution. Failure 
to do so may cause personal injury.
5.  Thoroughly leak test system after installation. Failure 
to do so could result in loss of refrigerant.
6.  These products are intended for use on CFC, HCFC, 
and HFC refrigerants.
 DonotuseEmersonlter-driersonanyotherun-
listedgasoruidmediawithoutpriorapprovalofthe
Emerson Climate Technologies Flow Controls Division 
ApplicationsEngineeringDepartment.Useonuids
not listed could result in chemical deterioration of the 
lter-drier.
7.  The products listed in the bulletin should not be used 
for hot gas applications.
Liquid Line Service
1.  For best results install the STAS steel take-apart 
shell in the liquid line between the receiver and the 
moisture-liquid indicator, solenoid valve and thermal 
expansion valve. The STAS shell may be mounted in 
any position; but the horizontal position is preferred 
inthatanycontaminantscollectedbythelter-drier
blocks will be more easily removed when installing 
newlter-drierblocks.
NOTE: The side connection of the STAS shell must always 
be the inlet when used on liquid line service to ensure 
system protection from possible block rupture.
Suction Line Service
1.  Locate the STAS shell in the suction line as close as 
possible to the compressor, but upstream of any vibra-
tion eliminator that might be present. Install the shell in 
a vertical position (outlet down), or as show in Figure 1 
which permits oil return to the compressor and conve-
nient removal of the internal hardware assembly.
NOTE: The side connection of the STAS shell must 
alwaysbetheinletwhenconventionalsuctionltersare
used,orwhenlter-drierblocksareusedforburnout
clean-up. The side connection may be used as an outlet 
ttingonly when a reverse ow lter, F-48R, will be used 
to prevent possible rupture with resulting discharge into 
the compressor.
1.  Install the shell in a location that affords adequate 
clearancetoremovetheentireoutletretainer/lter-
drier block assembly as noted below:
    SHELL SIZE  REQUIRED CLEARANCE
    STAS-48  7 ¼”
    STAS-96  12 ¾”
    STAS-144  18 ¼”
    STAS-192  23 ¾”
2.  Removal of the internal components of the STAS shell 
is not required before brazing into the system.
3.  Purge an inert gas such as nitrogen thru the lines 
while brazing to prevent formation of copper oxides. 
DO NOT USE OXYGEN.
4.  High temperature brazing alloys may be used as the 
STASttingsaresolidcopper.Normalprecautions
shouldbetakenbydirectingtheameawayfromthe
lter-driershell,andtheuseofchillblocks,wetrags 
or other suitable heat protection to minimize damage 
tothepaintsurfacesadjacenttothettingsisrecom-
mended.
5.  Test for leakage.
6. Installthelter-drierblocksasnotedonpage2.
NOTE:Ontheinitialinstallationofeitherlter-drierblocks
orltersthecardboardspacersusedtosecurethe
inlet retainer (and couplings as required) should be 
discarded.
Figure 1