Install Instructions
AFA E 1/2 H C 3/8 x 1/2
Valve External Capacity Refrigerant Charge SAE Connection
Series Equalizer Nominal Code Code Size
(omit for Rating in F = R12 C = med temp
internal) Tons H = R22 Z = low temp
R = R502 W = MOP (if needed)
AFA(E) NOMENCLATURE
MEASURING SUPERHEAT
1. Determine the suction pressure with an accurate gauge
at the evaporator outlet (see P in figure 2). On self-
contained systems, the suction pressure may be read at
the compressor suction connections.
2. From refrigerant pressure-temperature tables, determine
saturation temperature at observed suction pressure
(TEMP
P
).
3. Measure temperature of suction gas at thermal expan-
sion valve remote bulb location (TEMP
T
).
4. Subtract saturation temperature (read from tables in step
2) from temperature measured in step 3; the difference
is the superheat of the suction gas.
SUPERHEAT ADJUSTMENT
Emerson thermal expansion valves are factory set to a
specific superheat - however, the superheat should be
adjusted for the application. To adjust the valve to other
superheat settings:
1. Remove the seal cap from bottom of valve.
2. Turn the adjustment screw clockwise to increase
superheat and counterclockwise to decrease superheat.
One complete 360° turn changes the superheat approxi-
mately 3-4°F, regardless of the refrigerant type. As
much as 30 minutes may be required for the system to
stabilize after the adjustment is made.
3. Replace and hand-tighten seal cap.
Caution: There are 10 turns on the adjustment stem. When
adjusting superheat setting - when stop is reached, any
further turning adjustment will damage valve.
AFA(E) CONNECTIONS
TOLERANCE ± 5/32 ± 1/32 ± 3/64
INLET OUTLET A B C
3/8 1-41/64
1/4 1/2 1-23/64
elbow 5/8 1-63/64
3/8 – 1/2 1-47/64
3/8 1-41/64
3/8 1/2 1-23/64
elbow 5/8 1-63/64
3/8 – 1/2 1-47/64
1-41/64 1-5/16
1-3/32
1-49/64
EXTERNAL EQUALIZER
EVAPORATOR
REMOTE
BULB
EXPANSION
VALVE
DISTRIBUTOR
INCORRECT
REMOTE BULB LOCATION
SHOWN TRAPPED
EXTERNAL EQUALIZER
EVAPORATOR
REMOTE
BULB
EXPANSION
VALVE
DISTRIBUTOR
CORRECT
REMOTE BULB LOCATION
SHOWN FREE-DRAINING
69 PSIG = 40°F
59 PSIG = 33°F
59 PSIG = 40°F
EXTERNAL EQUALIZER
59 PSIG
40°F
T
P
TEMP
T
– TEMP
P
= SUPERHEAT
40° – 33° = 7°
FIGURE 2
FIGURE 1
AFA(E)
DIMENSIONAL DIAGRAMS & TABLE