Specifications
GeoDome Theater Installation and Operation Guide
Inflating
1. Turn the blower on high.
2. Let the Theater structure inflate. This should take about 5 minutes. (Figs 9, 10, 12, 13)
3. Plug the suction fan speed control into a 120V outlet. It will turn on automatically, but
make sure that the control dial is turned to the inflation mark (roughly 3 o’clock position).
This will set the correct amount of suction for the screen.
4. The internal screen should become taut. The amount of suction behind the screen can be
adjusted with the fan speed control. Make sure that the support structure does not show
through the screen after manually adjusting the speed control. (Fig. 11)
www.elumenati.com Page 7
(Fig. 12) Dome begins to inflate
(Fig. 13) Fully inflated Theater
(Fig. 9) Blower Speed Con-
trol
(Fig. 10) Inflating the Theat-
er
(Fig. 11) Setting screen ten-
sion










